Projects completed over 12 years, with contract values from 50k until 14M.

Those company contract value include:


Demolition

and enovation


Schools and

educational

facilities


Commercial

buildings, cinemas,

shops, and offices


Large-scale

warehousing


Civil engineering,

including drainage

systems and roads


Hotel

construction

PROJECT List :

Main Contractor: Brightcon Sdn Bhd

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Danga Bay, Johor


To supply and install Boom Lift and Aluminium Box Lourves Part at

Lot PTB 22902, Danga Bay, Jalan Skudai, Johor.


RM 219,500.00

March 2014

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
2.

Project : Nusajaya, Johor


To supply and install Cement Board, Aluminium Strip Ceiling and

Fibre Glass for Pejabat Sementara Berserta Ruang Pameran Dua

Tingkat di Sebahagian Lot PTD 178762, Mukim Pulai, Daerah Johor

Bahru, Nusajaya, Johor.

RM 234,963.99

March 2014

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
3.

Project : Taman Damai, Kota Tinggi, Johor


To supply and install Aluminium Box Lourves of 36 Units of Double

Storey Shop Office Type “C” at PTD 36668 & 36703, Taman Damai

Jaya, Mukim and District of Kota Tinggi, Johor for Daiman

Development Berhad.

RM 73,220.76

April 2014

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
4.

Project : Taman Molek, Johor


To supply and install Aluminium Strip Ceiling, Lourves and Partition

at Lot 83476, (PTD 115722), Jalan Masai Baru, Mukim Plentong,

Daerah Johor Bahru, Johor for Rest Sdn Bhd (JV with Daiman

Development Berhad) – Taman Molek.

RM 102,053.74

February 2015


PROJECT List :

Main Contractor: Buildglo Sdn Bhd

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Persada Bandar - Johor Bahru 

            

Proposed 1 Block of 4 Storey Retail on Lot PTB 24443 at 

Jalan Trus / Jalan Salim, Mukim Bandar, Johor Bahru,               

Johor Darul Takzim 

 

To supply and install DML Powder Coated Aluminium U-Profile custom made Façade.

RM 1,139,893.20

March 2019


PROJECT List :

Main Contractor: Dyna Elite Construction Sdn Bhd

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : PCP Camp, Rapid Pengerang Johor

 

To supply and install Partition Box Up to Colum, Beam and Truss,

PCP Labour Accommodation Camp.


RM 293,760.00

December 2015

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
2.

Project : TYOM – Camp, Rapid Pengerang Johor

 

To supply and install for Sort of Partition Works, TYOM - Camp

Design and Construction (Phase 2).


RM 418,981.61

January 2016

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
3.

Project : TOYO – Pengerang Johor

 

To supply and install for Sort of Architecture Work and Partition

Work for SCC Labour Accommodation Camp Security Office,

CDC Buildings, Medical Centre, Maintenance Shop, Mess Hall

and Rondo Metal Stud and Commercial Building.


RM 1,030,725.60

January 2016

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
4.

Project : PCP Camp, Rapid Pengerang Johor

 

To supply and install Partition Box Up to Colum, Beam and Truss,

PCP Labour Accommodation Camp (Variation Works).


RM 319,788.00

October 2016

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
5.

Project : Package 22, Rapid Pengerang Johor

 

To supply and Fixing False Ceiling, Plaster Board and Extruded

Polystyrene Insulation Board at PLSB – Building Plant and Non-

Plant (Part B) – Building 511, 512, 513 and 519.


RM 416,121.47

May 2017

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
6.

Project : Package 7, Rapid Pengerang, Johor

 

To Supply and install Partition and Ceiling Works for ecnimonthHQC-

EPCC of Campas & TCF, Pengerang Johor.

 

RM135,000.00

October 2017


PROJECT List :

Main Contractor: Dynaciate SPI Sdn Bhd

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project: Dynaciate’s New Office 4 ½ Storey DESB Corporate

Office at Pasir Gudang.


Supply and Install 9mm thk Boral Unispan and 9mm Boral Wetstop

and 32mm x 12mm x0.350mm G.I Metalstud Complete Skim Coat.


Supply and Install 100mm thk Bothsides Boral USG Boral Partition

Wall Complete Skim Coat.


Supply and Install 75mm x 40mm and 8mm clear Tempered Glass

Shop Front Glass Panel and 12mm thk Tempered Glass

Complete Accessories.


RM 638, 559.42

February 2020


PROJECT List :

MAIN CONTRACTOR: DYNACIATE ENGINEERING SDN BHD

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
1.

Project : Package 27, Rapid Pengerang Johor


To supply and install Partition and Ceiling Works for

TecnimontHQC – EPCC of Camps & TCF.

RM 775,842.39

June 2017

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
2.

Project: Sarawak Methanol Project


To Supply & Install 600Mm X 600Mm Daiken Rh 99 Item No.Mn 2011,

15Mm Thk Mineral Fibre Board and Hang by 3Mm Butterfly Hanger

Wire Hang to Roof Purlin


To Supply & Install Boral Rondo 64Mm X 32Mm X 0.75Mm Thk Metal

Stud and 1 Later 12.5Mm Thk Boral Standard Core and 1 Layer 50Mm

Thk 40Kg Rockwool Single Side Partition Wall


To Supply & Install Boral Rondo 64Mm X 32Mm X 0.75Mm Thk Metal

Stud and 1 Layer 12.5Mm Thk Boral Standard Core and 1 Layer 50Mm

Thk 40Kg Rockwool Bothside Partition

RM 1,987,078.50

April 2022

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
3.

PROJECT: PENANG INTEL-P8, HALAMAN KAMPUNG JAYA,BAYAN LEPAS


To Supply and Install Partition Wall and Ceiling , Timber Door and

Aluminium Window Works.

RM 1,526,701.59

December 2022

NO.
PROJECT TITLE
CONTRACT SUM
COMMENCEMENT DATE
4.

Project : EMC Penang


To supply and Install Wall and Ceiling Partition Works

RM 2,154,061.70

September 2024